{"id":13575,"date":"2026-07-27T21:51:26","date_gmt":"2026-07-27T13:51:26","guid":{"rendered":"https:\/\/raymonvalve.com\/product\/on-off-valve-package\/"},"modified":"2026-07-29T17:11:49","modified_gmt":"2026-07-29T09:11:49","slug":"on-off-valve-package","status":"publish","type":"product","link":"https:\/\/raymonvalve.com\/ar\/product\/on-off-valve-package\/","title":{"rendered":"\u062d\u0632\u0645\u0629 \u0635\u0645\u0627\u0645 \u062a\u0634\u063a\u064a\u0644\/\u0625\u064a\u0642\u0627\u0641"},"content":{"rendered":"<div class=\"rv-product-content rvp-content\">\n<section id=\"overview\" class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Engineering scope<\/div>\n<h2>From product name to an engineered On-Off Valve Package requirement<\/h2>\n<p class=\"rvp-lead\">A On-Off Valve Package is evaluated for integrated automated valve operation. The valve, actuator, mounting kit, controls and feedback devices are specified, assembled and function-tested as one tagged package.<\/p>\n<p>The product name narrows the route but does not complete the specification. Resolve discrete isolation, travel time, cycling and end-position confirmation together with the medium, operating cases, piping interface, maintenance and evidence.<\/p>\n<div class=\"rvp-grid\">\n<div class=\"rvp-card\">\n<h3>On-Off<\/h3>\n<p>Discrete isolation, travel time, cycling and end-position confirmation. Define normal and emergency cycle time, starts per hour, fail state, switches and interlocks.<\/p>\n<\/div>\n<div class=\"rvp-card\">\n<h3>Application envelope<\/h3>\n<p>Confirm every pressure, temperature, differential-pressure and cycling case for this On-Off Valve Package.<\/p>\n<\/div>\n<div class=\"rvp-card\">\n<h3>Installed interface<\/h3>\n<p>Verify ends, bore, flow direction, orientation, operator envelope, loads and maintenance access.<\/p>\n<\/div>\n<div class=\"rvp-card\">\n<h3>Order-specific boundary<\/h3>\n<p>Website content is not tag-level certification. Suitability and supplied scope are established only by the accepted quotation, datasheet and drawing.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n<section id=\"specifications\" class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Specification workflow<\/div>\n<h2>Convert process conditions into an auditable valve specification<\/h2>\n<p class=\"rvp-lead\">Use the matrix to close decisions often hidden behind the short description \u201cOn-Off Valve Package.\u201d<\/p>\n<div class=\"rvp-tablewrap\">\n<table class=\"rvp-table\">\n<thead>\n<tr>\n<th>Review area<\/th>\n<th>Engineering question<\/th>\n<th>Required record<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Package responsibility<\/td>\n<td>One approved scope must identify valve, actuator, controls, tubing, wiring and documentation boundaries.<\/td>\n<td>Make this requirement auditable through the order datasheet, design review and inspection plan.<\/td>\n<\/tr>\n<tr>\n<td>Safety action<\/td>\n<td>Fail state, trip logic, reset method and partial-stroke requirements must be defined.<\/td>\n<td>Capture the selection basis, approved deviation if any and the record used for acceptance.<\/td>\n<\/tr>\n<tr>\n<td>Interfaces<\/td>\n<td>Power, air, signal, hazardous-area and communication interfaces require project coordination.<\/td>\n<td>Resolve the open point before release and retain tag-specific evidence in the final dossier.<\/td>\n<\/tr>\n<tr>\n<td>Testing<\/td>\n<td>Functional, fail-action and interface checks must use approved acceptance criteria.<\/td>\n<td>Resolve the open point before release and retain tag-specific evidence in the final dossier.<\/td>\n<\/tr>\n<tr>\n<td>On-Off<\/td>\n<td>Define normal and emergency cycle time, starts per hour, fail state, switches and interlocks.<\/td>\n<td>Capture the selection basis, approved deviation if any and the record used for acceptance.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p class=\"rvp-note\">Check standards and acceptance criteria against the purchaser-approved edition before order release.<\/p>\n<\/div>\n<\/section>\n<section id=\"applications\" class=\"rvp-section rvp-dark\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Application boundaries<\/div>\n<h2>Service conditions that can change or reject the selection<\/h2>\n<p>Component nameplates alone do not prove package performance; assembly-level testing and records are required. The final decision must cover system interactions, end-of-life loads, degradation and how failure will be detected or contained.<\/p>\n<div class=\"rvp-checks\">\n<div class=\"rvp-check\">Process envelope, contaminants, phase behavior and every case that can govern the On-Off Valve Package<\/div>\n<div class=\"rvp-check\">Isolation\/control\/non-return function, frequency, directionality and measurable shutoff acceptance<\/div>\n<div class=\"rvp-check\">Piping class, mating ends, bore, installed length, orientation, loads and maintenance clearance<\/div>\n<div class=\"rvp-check\">Body, trim, seat, packing, bolting, lining or coating materials as applicable<\/div>\n<div class=\"rvp-check\">Worst-case torque\/thrust, cycle duty, travel time, fail behavior, minimum utility and control accessories<\/div>\n<div class=\"rvp-check\">Exact standards and editions, ITP points, material\/NDE\/pressure\/leakage tests and turnover index<\/div>\n<\/div>\n<\/div>\n<\/section>\n<section id=\"quality\" class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Evidence and quality<\/div>\n<h2>Define the manufacturing and test proof before release<\/h2>\n<p class=\"rvp-lead\">Generic examples may explain capability but cannot close an order requirement unless they apply to the delivered valve. Use the <a href=\"\/valve-standards\/\">valve standards guide<\/a> to separate product, rating, dimensional, end-connection and test scope.<\/p>\n<div class=\"rvp-grid\">\n<div class=\"rvp-card\">\n<h3>Design basis<\/h3>\n<p>Tag requirements, design review, materials list and approved exception register.<\/p>\n<\/div>\n<div class=\"rvp-card\">\n<h3>Material identity<\/h3>\n<p>Component certificates, heat or lot traceability, heat treatment, hardness and required PMI or NDE.<\/p>\n<\/div>\n<div class=\"rvp-card\">\n<h3>Inspection and tests<\/h3>\n<p>Approved ITP, procedures, calibrated instruments, results, witness records and NCR closeout.<\/p>\n<\/div>\n<\/div>\n<p>Fast closure may create surge and increased valve load.<\/p>\n<p>Qualification, testing and material suitability are conditional on the approved scope and supplied records for the actual configuration.<\/p>\n<\/div>\n<\/section>\n<section id=\"rfq\" class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">RFQ checklist<\/div>\n<h2>Data to send for a technically complete quotation<\/h2>\n<p>A useful RFQ combines process data, piping class, construction and materials, operator\/actuator requirements, acceptance criteria and delivery documents.<\/p>\n<p>For a On-Off Valve Package, also highlight discrete isolation, travel time, cycling and end-position confirmation. List unresolved assumptions as deviations instead of embedding them silently in the offer.<\/p>\n<div class=\"rvp-cta\">\n<div>\n<h2>Ask for a configuration tied to the real duty<\/h2>\n<p>Share the datasheet, line class and evidence scope so open points and deviations can be resolved before order release.<\/p>\n<\/div>\n<div class=\"rvp-actions\"><a class=\"rvp-btn rvp-btn-primary\" href=\"\/contact\/\">Submit Your Datasheet<\/a><a class=\"rvp-btn rvp-btn-ghost\" href=\"\/actuated-valves\/\">Compare Valve Automation Package Options<\/a><\/div>\n<\/div>\n<\/div>\n<\/section>\n<section class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Related engineering route<\/div>\n<h2>Continue the selection review<\/h2>\n<div class=\"rvp-grid\"><a class=\"rvp-card\" href=\"\/actuated-valves\/\"><\/p>\n<h3>Product family<\/h3>\n<p>Compare the main constructions and selection boundaries in this valve family.<\/p>\n<p><\/a><a class=\"rvp-card\" href=\"\/valve-solutions\/\"><\/p>\n<h3>Project Valve Review<\/h3>\n<p>Resolve interacting pressure, temperature, corrosion, wear or project risks.<\/p>\n<p><\/a><a class=\"rvp-card\" href=\"\/valve-pressure-testing\/\"><\/p>\n<h3>Testing and inspection<\/h3>\n<p>Define pressure-test scope, acceptance, instruments, witness points and records.<\/p>\n<p><\/a><\/div>\n<\/div>\n<\/section>\n<p><!-- RVQ-CSS-START --><\/p>\n<style id=\"rvq-quality-css\">.rvq-section{padding:68px 0;font-family:Arial,Helvetica,sans-serif;color:#17233a;line-height:1.7}.rvq-wrap{width:min(1160px,calc(100% - 40px));margin:auto}.rvq-intent{background:#f4f7fb}.rvq-trust{background:#fff}.rvq-kicker{color:#07549a;font-size:12px;font-weight:800;letter-spacing:.13em;text-transform:uppercase}.rvq-section h2{font-size:clamp(28px,3.5vw,42px);line-height:1.2;margin:8px 0 16px;color:#0b1731}.rvq-lead{max-width:900px;color:#5c6779;font-size:17px}.rvq-tablewrap{overflow-x:auto;margin-top:28px;border:1px solid #dfe5ee;border-radius:12px;background:#fff}.rvq-table{width:100%;border-collapse:collapse;min-width:760px}.rvq-table th{background:#07549a;color:#fff;text-align:left;padding:15px}.rvq-table td{padding:15px;border-bottom:1px solid #dfe5ee;vertical-align:top}.rvq-table tr:last-child td{border-bottom:0}.rvq-source,.rvq-boundary{margin-top:22px;padding:20px;border-left:5px solid #f3cc18;background:#fff8d8;border-radius:8px}.rvq-grid{display:grid;grid-template-columns:repeat(4,1fr);gap:14px;margin:25px 0}.rvq-grid>div{border:1px solid #dfe5ee;border-radius:10px;padding:18px;background:#f8fafc}.rvq-grid b,.rvq-grid span{display:block}.rvq-grid b{color:#07549a;margin-bottom:5px}.rvq-grid span{font-size:14px;color:#5c6779}@media(max-width:800px){.rvq-grid{grid-template-columns:1fr 1fr}}@media(max-width:520px){.rvq-wrap{width:min(100% - 28px,1160px)}.rvq-section{padding:50px 0}.rvq-grid{grid-template-columns:1fr}}<\/style>\n<p><!-- RVQ-CSS-END --><!-- RVQ-INTENT-START --><\/p>\n<section class=\"rvq-section rvq-intent\">\n<div class=\"rvq-wrap\">\n<div class=\"rvq-kicker\">Task-specific answer<\/div>\n<h2>Convert On-Off Valve Package from a broad request into an auditable engineering decision<\/h2>\n<p class=\"rvq-lead\">This section addresses the decision a visitor is likely trying to complete\u2014not merely the meaning of the page title. Use it to identify required inputs, compare the proposal and specify the record that will prove acceptance.<\/p>\n<div class=\"rvq-tablewrap\">\n<table class=\"rvq-table\">\n<thead>\n<tr>\n<th>Decision<\/th>\n<th>What to do<\/th>\n<th>Evidence to retain<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><b>Problem statement<\/b><\/td>\n<td>For On-Off Valve Package, define the required system outcome, failure consequence and measurable acceptance before choosing hardware.<\/td>\n<td>Functional requirement<\/td>\n<\/tr>\n<tr>\n<td><b>Feasible routes<\/b><\/td>\n<td>Compare at least the practical construction, material, sealing and actuation alternatives, including reasons for rejection.<\/td>\n<td>Option and trade-off matrix<\/td>\n<\/tr>\n<tr>\n<td><b>Boundary conditions<\/b><\/td>\n<td>Check every normal, transient, startup, shutdown, maintenance and utility-loss case that can change the solution.<\/td>\n<td>Approved application data<\/td>\n<\/tr>\n<tr>\n<td><b>Validation<\/b><\/td>\n<td>Connect each claimed benefit to a calculation, drawing, qualification, inspection or package-level test that applies to the order.<\/td>\n<td>Verification and evidence plan<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<div class=\"rvq-boundary\"><b>Decision boundary:<\/b> This guidance supports screening and RFQ preparation. Final suitability, compliance and supplied scope require the actual application data, governing jurisdiction, contract documents, approved supplier submittals and tag-linked records.<\/div>\n<\/div>\n<\/section>\n<p><!-- RVQ-INTENT-END --><!-- RVQ-TRUST-START --><\/p>\n<section class=\"rvq-section rvq-trust\">\n<div class=\"rvq-wrap\">\n<div class=\"rvq-kicker\">Content responsibility &amp; evidence<\/div>\n<h2>How this On-Off Valve Package guide should be used<\/h2>\n<div class=\"rvq-grid\">\n<div><b>Publisher<\/b><span>Raymon Valve technical content team<\/span><\/div>\n<div><b>Purpose<\/b><span>Engineering screening, specification and RFQ preparation<\/span><\/div>\n<div><b>Content update<\/b><span>29 July 2026<\/span><\/div>\n<div><b>Verification level<\/b><span>Topic scope, search intent and evidence boundaries checked<\/span><\/div>\n<\/div>\n<p>This page does not claim that a named person, certificate, qualification, installed project or performance result applies to a future order. Product compliance is confirmed only when the accepted quotation, approved drawing, procedures and final manufacturing\/test records identify the supplied configuration.<\/p>\n<p>Technical requirements and standards can change. Verify the official source, contract edition, project precedence and purchaser options. See our <a href=\"\/technical-content-review-policy\/\">technical content review and evidence policy<\/a>, <a href=\"\/about-us\/\">company information<\/a>, <a href=\"\/valve-inspection\/\">inspection approach<\/a> or <a href=\"\/contact\/\">submit a correction or application question<\/a>.<\/p>\n<\/div>\n<\/section>\n<p><!-- RVQ-TRUST-END --><!-- RVQ-SCHEMA-START --><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"WebPage\",\"name\":\"On-Off Valve Package\",\"url\":\"https:\/\/raymonvalve.com\/product\/on-off-valve-package\/\",\"dateModified\":\"2026-07-29\",\"description\":\"Product selection guide for On-Off Valve Package, with application boundaries, decision inputs and order-specific evidence requirements.\",\"publisher\":{\"@type\":\"Organization\",\"name\":\"Raymon Valve\",\"url\":\"https:\/\/raymonvalve.com\/\"},\"isPartOf\":{\"@type\":\"WebSite\",\"name\":\"Raymon Valve\",\"url\":\"https:\/\/raymonvalve.com\/\"},\"about\":{\"@type\":\"Thing\",\"name\":\"On-Off Valve Package\"}}<\/script><!-- RVQ-SCHEMA-END --><\/p>\n<section id=\"faq\" class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">FAQ<\/div>\n<h2>On-Off Valve Package questions<\/h2>\n<div class=\"rvp-faq\">\n<details>\n<summary>What information is required to select a On-Off Valve Package?<\/summary>\n<p>Provide the medium and composition, all pressure and temperature cases, nominal size, flow or differential pressure where relevant, required function, end connections, materials, shutoff criterion, operation, standards, inspection and documentation. For this configuration, the review must specifically address discrete isolation, travel time, cycling and end-position confirmation.<\/p>\n<\/details>\n<details>\n<summary>Which standards apply to a On-Off Valve Package?<\/summary>\n<p>The answer depends on the product construction, project jurisdiction and purchaser specification. A product standard may cover design scope while separate standards govern pressure-temperature rating, dimensions, ends, pressure testing, fire safety, emissions or materials. Fast closure may create surge and increased valve load.<\/p>\n<\/details>\n<details>\n<summary>How should On-Off Valve Package pressure and leakage testing be specified?<\/summary>\n<p>Separate pressure-boundary, closure, functional and any special testing. Record the procedure, edition, duration, allowable leakage, intervention point and final evidence.<\/p>\n<\/details>\n<details>\n<summary>Can a On-Off Valve Package be supplied with an actuator?<\/summary>\n<p>Where automation is feasible, size from the worst-case valve torque or thrust curve, project margin, fail action, travel time, minimum utility, duty, controls, mounting and package test.<\/p>\n<\/details>\n<details>\n<summary>When should a On-Off Valve Package not be selected?<\/summary>\n<p>Do not select it when its qualified construction cannot satisfy the process, shutoff, materials, dynamics, maintenance or documentation requirements. Component nameplates alone do not prove package performance; assembly-level testing and records are required. The alternative should be chosen only after comparing the complete service duty.<\/p>\n<\/details>\n<\/div>\n<\/div>\n<\/section>\n<\/div>\n<p><script type=\"application\/ld+json\">{\"@context\": \"https:\/\/schema.org\", \"@type\": \"FAQPage\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"What information is required to select a On-Off Valve Package?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Provide the medium and composition, all pressure and temperature cases, nominal size, flow or differential pressure where relevant, required function, end connections, materials, shutoff criterion, operation, standards, inspection and documentation. For this configuration, the review must specifically address discrete isolation, travel time, cycling and end-position confirmation.\"}}, {\"@type\": \"Question\", \"name\": \"Which standards apply to a On-Off Valve Package?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"The answer depends on the product construction, project jurisdiction and purchaser specification. A product standard may cover design scope while separate standards govern pressure-temperature rating, dimensions, ends, pressure testing, fire safety, emissions or materials. Fast closure may create surge and increased valve load.\"}}, {\"@type\": \"Question\", \"name\": \"How should On-Off Valve Package pressure and leakage testing be specified?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Separate pressure-boundary, closure, functional and any special testing. Record the procedure, edition, duration, allowable leakage, intervention point and final evidence.\"}}, {\"@type\": \"Question\", \"name\": \"Can a On-Off Valve Package be supplied with an actuator?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Where automation is feasible, size from the worst-case valve torque or thrust curve, project margin, fail action, travel time, minimum utility, duty, controls, mounting and package test.\"}}, {\"@type\": \"Question\", \"name\": \"When should a On-Off Valve Package not be selected?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Do not select it when its qualified construction cannot satisfy the process, shutoff, materials, dynamics, maintenance or documentation requirements. Component nameplates alone do not prove package performance; assembly-level testing and records are required. The alternative should be chosen only after comparing the complete service duty.\"}}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u062d\u0632\u0645\u0629 \u0635\u0645\u0627\u0645 \u062a\u0634\u063a\u064a\u0644\/\u0625\u064a\u0642\u0627\u0641 \u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0635\u0645\u0627\u0645 \u0627\u0644\u0622\u0644\u064a \u0627\u0644\u0645\u062a\u0643\u0627\u0645\u0644 \u0627\u0644\u0645\u062d\u062f\u062f \u0644\u0644\u0645\u0634\u0631\u0648\u0639. \u062a\u0639\u0627\u0644\u062c \u0627\u0644\u0627\u062e\u062a\u064a\u0627\u0631\u0627\u062a \u0627\u0644\u0639\u0632\u0644 \u0627\u0644\u0645\u0646\u0641\u0635\u0644\u060c \u0648\u0648\u0642\u062a \u0627\u0644\u062d\u0631\u0643\u0629\u060c \u0648\u0627\u0644\u062f\u0648\u0631\u0627\u0646\u060c \u0648\u062a\u0623\u0643\u064a\u062f \u0627\u0644\u0648\u0636\u0639 \u0627\u0644\u0646\u0647\u0627\u0626\u064a\u060c \u0648\u0627\u0644\u0645\u0648\u0627\u062f\u060c \u0648\u0627\u0644\u062a\u0634\u063a\u064a\u0644\u060c \u0648\u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631\u060c \u0648\u0627\u0644\u0642\u0628\u0648\u0644 \u0627\u0644\u0645\u0648\u062b\u0642 \u0642\u0628\u0644 \u0625\u0635\u062f\u0627\u0631 \u0639\u0631\u0636 \u0627\u0644\u0633\u0639\u0631.<\/p>","protected":false},"featured_media":3757,"comment_status":"closed","ping_status":"closed","template":"","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}}},"product_brand":[],"product_cat":[],"product_tag":[],"class_list":["post-13575","product","type-product","status-publish","has-post-thumbnail","desktop-align-left","tablet-align-left","mobile-align-left","ast-product-gallery-layout-horizontal-slider","ast-product-gallery-with-no-image","ast-product-tabs-layout-horizontal","ast-qv-on-image","first","instock","shipping-taxable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/raymonvalve.com\/ar\/wp-json\/wp\/v2\/product\/13575","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/raymonvalve.com\/ar\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/raymonvalve.com\/ar\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/raymonvalve.com\/ar\/wp-json\/wp\/v2\/comments?post=13575"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/raymonvalve.com\/ar\/wp-json\/wp\/v2\/media\/3757"}],"wp:attachment":[{"href":"https:\/\/raymonvalve.com\/ar\/wp-json\/wp\/v2\/media?parent=13575"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/raymonvalve.com\/ar\/wp-json\/wp\/v2\/product_brand?post=13575"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/raymonvalve.com\/ar\/wp-json\/wp\/v2\/product_cat?post=13575"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/raymonvalve.com\/ar\/wp-json\/wp\/v2\/product_tag?post=13575"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}