{"id":3751,"date":"2022-08-24T15:09:40","date_gmt":"2022-08-24T07:09:40","guid":{"rendered":"https:\/\/limegreen-okapi-448594.hostingersite.com\/?post_type=product&#038;p=3751"},"modified":"2026-07-29T19:25:14","modified_gmt":"2026-07-29T11:25:14","slug":"high-temperature-and-high-pressure-electric-control-valve","status":"publish","type":"product","link":"https:\/\/raymonvalve.com\/pt\/product\/high-temperature-and-high-pressure-electric-control-valve\/","title":{"rendered":"V\u00e1lvula de Controle El\u00e9trica para Alta Temperatura e Alta Press\u00e3o"},"content":{"rendered":"<div class=\"rv-product-content rvp-content\">\n<section id=\"overview\" class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Engineering scope<\/div>\n<h2>Define the application boundary for High-Temperature High-Pressure Electric Control Valve<\/h2>\n<p class=\"rvp-lead\">A High-Temperature High-Pressure Electric Control Valve is evaluated for modulating process control. A throttling element changes effective flow area in response to a control signal. Installed characteristic, Cv, pressure recovery, trim velocity and actuator resolution determine control quality.<\/p>\n<p>Use the name as a starting point. Technical approval still depends on electric actuator torque\/thrust, duty rating, power, controls and fail strategy, the complete service envelope, installed interfaces and measurable acceptance.<\/p>\n<div class=\"rvp-grid\">\n<div class=\"rvp-card\">\n<h3>Electric<\/h3>\n<p>Electric actuator torque\/thrust, duty rating, power, controls and fail strategy. State power supply, control signal, duty cycle, travel time, enclosure, hazardous area, manual override and fail requirement.<\/p>\n<\/div>\n<div class=\"rvp-card\">\n<h3>Application envelope<\/h3>\n<p>Confirm every pressure, temperature, differential-pressure and cycling case for this High-Temperature High-Pressure Electric Control Valve.<\/p>\n<\/div>\n<div class=\"rvp-card\">\n<h3>Installed interface<\/h3>\n<p>Verify ends, bore, flow direction, orientation, operator envelope, loads and maintenance access.<\/p>\n<\/div>\n<div class=\"rvp-card\">\n<h3>Order-specific boundary<\/h3>\n<p>Website content is not tag-level certification. Suitability and supplied scope are established only by the accepted quotation, datasheet and drawing.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n<section id=\"published-data\" class=\"rvp-section rvp-legacy-data\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Existing listing data<\/div>\n<h2>Published configuration data for High-Temperature High-Pressure Electric Control Valve\u2014confirmation required<\/h2>\n<p class=\"rvp-lead\">The values below are transcribed from the previous public product listing so useful model information is not lost during the quality rebuild. They are not a universal available range, certificate or order commitment. Confirm every value in the accepted quotation, tag datasheet and approved drawing.<\/p>\n<div class=\"rvp-tablewrap\">\n<table class=\"rvp-table\">\n<thead>\n<tr>\n<th>Parameter<\/th>\n<th>Previous listing<\/th>\n<th>Required order check<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><b>Product type<\/b><\/td>\n<td>Not stated in the previous public listing.<\/td>\n<td>Confirm the exact model, construction and supplied configuration.<\/td>\n<\/tr>\n<tr>\n<td><b>Nominal size \/ DN<\/b><\/td>\n<td>25-200<\/td>\n<td>Confirm each ordered tag and available trim or bore combination.<\/td>\n<\/tr>\n<tr>\n<td><b>Pressure rating<\/b><\/td>\n<td>PN16-420 ANSI Class 150-2500<\/td>\n<td>Confirm governing rating standard, class and temperature basis.<\/td>\n<\/tr>\n<tr>\n<td><b>Temperature<\/b><\/td>\n<td>20~550\u2103<\/td>\n<td>Confirm design, operating, startup and upset metal temperatures.<\/td>\n<\/tr>\n<tr>\n<td><b>End connection<\/b><\/td>\n<td>GB, DIN, ANSI JIS, etc.<\/td>\n<td>Confirm standard, facing, schedule, bore and mating interface.<\/td>\n<\/tr>\n<tr>\n<td><b>Flow coefficient \/ characteristic<\/b><\/td>\n<td>quick opening, linear, equal percentage<\/td>\n<td>Confirm calculated cases, trim, travel and installed behavior.<\/td>\n<\/tr>\n<tr>\n<td><b>Body \/ bonnet material<\/b><\/td>\n<td>Not stated in the previous public listing.<\/td>\n<td>Confirm component grade, product form, heat treatment and records.<\/td>\n<\/tr>\n<tr>\n<td><b>Trim \/ closure material<\/b><\/td>\n<td>Not stated in the previous public listing.<\/td>\n<td>Confirm every wetted component, hardness, coating and pairing.<\/td>\n<\/tr>\n<tr>\n<td><b>Seat \/ seal material<\/b><\/td>\n<td>PTFE, flexible graphite Optional: &#8211; Oil-free degreasing treatment Features: &#8211; The balanced valve core structure is adopted, the axial unbalanced force is small, the allowable pressure difference is large, and the stability is good. &#8211; Large spool guide surface<\/td>\n<td>Confirm compatibility, leakage criterion and pressure-temperature limit.<\/td>\n<\/tr>\n<tr>\n<td><b>Operation \/ actuator<\/b><\/td>\n<td>Not stated in the previous public listing.<\/td>\n<td>Confirm worst-case load, fail state, utilities, speed and accessories.<\/td>\n<\/tr>\n<tr>\n<td><b>Leakage basis<\/b><\/td>\n<td>Class II, Class V Material: -Body, Bonnet: Carbon Steel, Chrome Molybdenum Steel, Stainless Steel -Spool, Cage: Stainless Steel<\/td>\n<td>Confirm standard, edition, test direction, medium and measurable acceptance.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p class=\"rvp-note\"><b>Evidence boundary:<\/b> where the previous listing was incomplete or awkwardly translated, this page does not guess a value. Raymon Valve should replace provisional web data with the controlled product datasheet when it is available.<\/p>\n<\/div>\n<\/section>\n<section id=\"specifications\" class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Specification workflow<\/div>\n<h2>Convert process conditions into an auditable valve specification<\/h2>\n<p class=\"rvp-lead\">The table turns application inputs for High-Temperature High-Pressure Electric Control Valve into review points and tag-linked evidence.<\/p>\n<div class=\"rvp-tablewrap\">\n<table class=\"rvp-table\">\n<thead>\n<tr>\n<th>Review area<\/th>\n<th>Engineering question<\/th>\n<th>Required record<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Sizing cases<\/td>\n<td>Minimum, normal, maximum, startup and upset cases require verified fluid properties and pressures.<\/td>\n<td>Resolve the open point before release and retain tag-specific evidence in the final dossier.<\/td>\n<\/tr>\n<tr>\n<td>Trim duty<\/td>\n<td>Cavitation, flashing, choked gas flow, noise, erosion and rangeability must be evaluated.<\/td>\n<td>Resolve the open point before release and retain tag-specific evidence in the final dossier.<\/td>\n<\/tr>\n<tr>\n<td>Actuator<\/td>\n<td>Required thrust or torque, fail action, stroking speed and utility supply must be coordinated.<\/td>\n<td>Resolve the open point before release and retain tag-specific evidence in the final dossier.<\/td>\n<\/tr>\n<tr>\n<td>Accessories<\/td>\n<td>Positioner, solenoids, limit switches, air set and hazardous-area requirements form one package.<\/td>\n<td>Freeze the accepted value in the tag datasheet and verify it on the approved drawing.<\/td>\n<\/tr>\n<tr>\n<td>Electric<\/td>\n<td>State power supply, control signal, duty cycle, travel time, enclosure, hazardous area, manual override and fail requirement.<\/td>\n<td>State the measurable requirement and connect it to a drawing, procedure or test result.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p class=\"rvp-note\">A standard title alone is not acceptance. Map its scope, edition and required evidence to the valve tag.<\/p>\n<\/div>\n<\/section>\n<section id=\"applications\" class=\"rvp-section rvp-dark\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Application boundaries<\/div>\n<h2>Application limits to examine before technical approval<\/h2>\n<p>Do not size a control valve from pipe diameter alone; incorrect Cv can cause poor resolution, noise, cavitation or premature trim damage. Installed behavior can be governed by flow dynamics, deposits, operating frequency, maintenance access and the response to abnormal conditions.<\/p>\n<div class=\"rvp-checks\">\n<div class=\"rvp-check\">Process envelope, contaminants, phase behavior and every case that can govern the High-Temperature High-Pressure Electric Control Valve<\/div>\n<div class=\"rvp-check\">Required valve function, operating frequency, shutoff criterion and failure consequence<\/div>\n<div class=\"rvp-check\">Piping class, mating ends, bore, installed length, orientation, loads and maintenance clearance<\/div>\n<div class=\"rvp-check\">Body, trim, seat, packing, bolting, lining or coating materials as applicable<\/div>\n<div class=\"rvp-check\">Manual or actuated operation, maximum load, fail action, speed, utilities and accessories<\/div>\n<div class=\"rvp-check\">Exact standards and editions, ITP points, material\/NDE\/pressure\/leakage tests and turnover index<\/div>\n<\/div>\n<\/div>\n<\/section>\n<section id=\"quality\" class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Evidence and quality<\/div>\n<h2>Make every critical claim traceable to the valve tag<\/h2>\n<p class=\"rvp-lead\">Generic examples may explain capability but cannot close an order requirement unless they apply to the delivered valve. Use the <a href=\"\/valve-standards\/\">valve standards guide<\/a> to separate product, rating, dimensional, end-connection and test scope.<\/p>\n<div class=\"rvp-grid\">\n<div class=\"rvp-card\">\n<h3>Design basis<\/h3>\n<p>Tag requirements, design review, materials list and approved exception register.<\/p>\n<\/div>\n<div class=\"rvp-card\">\n<h3>Material identity<\/h3>\n<p>Pressure and wetted-part traceability plus welding, heat treatment, hardness and inspection evidence.<\/p>\n<\/div>\n<div class=\"rvp-card\">\n<h3>Inspection and tests<\/h3>\n<p>Hold\/witness records, material\/NDE\/pressure\/leakage\/functional results and nonconformance closure.<\/p>\n<\/div>\n<\/div>\n<p>Electric fail action may require stored energy or an external system; loss-of-power behavior must be explicit.<\/p>\n<p>Do not infer certification or guaranteed performance from this page. Accept only the order-specific evidence required by the purchaser.<\/p>\n<\/div>\n<\/section>\n<section id=\"rfq\" class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">RFQ checklist<\/div>\n<h2>RFQ inputs that remove avoidable assumptions<\/h2>\n<p>Send tag identity, quantity, fluid, all design and operating cases, line interface, function, flow data, materials, operation, testing, inspection and turnover scope.<\/p>\n<p>For a High-Temperature High-Pressure Electric Control Valve, also highlight electric actuator torque\/thrust, duty rating, power, controls and fail strategy. List unresolved assumptions as deviations instead of embedding them silently in the offer.<\/p>\n<div class=\"rvp-cta\">\n<div>\n<h2>Request a tag-level technical review<\/h2>\n<p>Send the valve list and project requirements. Raymon Valve will identify missing inputs, clarify construction and return an order-specific quotation basis.<\/p>\n<\/div>\n<div class=\"rvp-actions\"><a class=\"rvp-btn rvp-btn-primary\" href=\"\/contact\/\">Submit Your Datasheet<\/a><a class=\"rvp-btn rvp-btn-ghost\" href=\"\/control-valves\/\">Compare Control Valve Options<\/a><\/div>\n<\/div>\n<\/div>\n<\/section>\n<section class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Related engineering route<\/div>\n<h2>Follow the product, application and inspection route<\/h2>\n<div class=\"rvp-grid\"><a class=\"rvp-card\" href=\"\/control-valves\/\"><\/p>\n<h3>Product family<\/h3>\n<p>Compare the main constructions and selection boundaries in this valve family.<\/p>\n<p><\/a><a class=\"rvp-card\" href=\"\/valve-solutions\/\"><\/p>\n<h3>Project Valve Review<\/h3>\n<p>Resolve interacting pressure, temperature, corrosion, wear or project risks.<\/p>\n<p><\/a><a class=\"rvp-card\" href=\"\/valve-pressure-testing\/\"><\/p>\n<h3>Testing and inspection<\/h3>\n<p>Define pressure-test scope, acceptance, instruments, witness points and records.<\/p>\n<p><\/a><\/div>\n<\/div>\n<\/section>\n<p><!-- RVQ-CSS-START --><\/p>\n<style id=\"rvq-quality-css\">.rvq-section{padding:68px 0;font-family:Arial,Helvetica,sans-serif;color:#17233a;line-height:1.7}.rvq-wrap{width:min(1160px,calc(100% - 40px));margin:auto}.rvq-intent{background:#f4f7fb}.rvq-trust{background:#fff}.rvq-kicker{color:#07549a;font-size:12px;font-weight:800;letter-spacing:.13em;text-transform:uppercase}.rvq-section h2{font-size:clamp(28px,3.5vw,42px);line-height:1.2;margin:8px 0 16px;color:#0b1731}.rvq-lead{max-width:900px;color:#5c6779;font-size:17px}.rvq-tablewrap{overflow-x:auto;margin-top:28px;border:1px solid #dfe5ee;border-radius:12px;background:#fff}.rvq-table{width:100%;border-collapse:collapse;min-width:760px}.rvq-table th{background:#07549a;color:#fff;text-align:left;padding:15px}.rvq-table td{padding:15px;border-bottom:1px solid #dfe5ee;vertical-align:top}.rvq-table tr:last-child td{border-bottom:0}.rvq-source,.rvq-boundary{margin-top:22px;padding:20px;border-left:5px solid #f3cc18;background:#fff8d8;border-radius:8px}.rvq-grid{display:grid;grid-template-columns:repeat(4,1fr);gap:14px;margin:25px 0}.rvq-grid>div{border:1px solid #dfe5ee;border-radius:10px;padding:18px;background:#f8fafc}.rvq-grid b,.rvq-grid span{display:block}.rvq-grid b{color:#07549a;margin-bottom:5px}.rvq-grid span{font-size:14px;color:#5c6779}@media(max-width:800px){.rvq-grid{grid-template-columns:1fr 1fr}}@media(max-width:520px){.rvq-wrap{width:min(100% - 28px,1160px)}.rvq-section{padding:50px 0}.rvq-grid{grid-template-columns:1fr}}<\/style>\n<p><!-- RVQ-CSS-END --><!-- RVQ-INTENT-START --><\/p>\n<section class=\"rvq-section rvq-intent\">\n<div class=\"rvq-wrap\">\n<div class=\"rvq-kicker\">Task-specific answer<\/div>\n<h2>Convert High-Temperature High-Pressure Electric Control Valve from a broad request into an auditable engineering decision<\/h2>\n<p class=\"rvq-lead\">This section addresses the decision a visitor is likely trying to complete\u2014not merely the meaning of the page title. Use it to identify required inputs, compare the proposal and specify the record that will prove acceptance.<\/p>\n<div class=\"rvq-tablewrap\">\n<table class=\"rvq-table\">\n<thead>\n<tr>\n<th>Decision<\/th>\n<th>What to do<\/th>\n<th>Evidence to retain<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><b>Problem statement<\/b><\/td>\n<td>For High-Temperature High-Pressure Electric Control Valve, define the required system outcome, failure consequence and measurable acceptance before choosing hardware.<\/td>\n<td>Functional requirement<\/td>\n<\/tr>\n<tr>\n<td><b>Feasible routes<\/b><\/td>\n<td>Compare at least the practical construction, material, sealing and actuation alternatives, including reasons for rejection.<\/td>\n<td>Option and trade-off matrix<\/td>\n<\/tr>\n<tr>\n<td><b>Boundary conditions<\/b><\/td>\n<td>Check every normal, transient, startup, shutdown, maintenance and utility-loss case that can change the solution.<\/td>\n<td>Approved application data<\/td>\n<\/tr>\n<tr>\n<td><b>Validation<\/b><\/td>\n<td>Connect each claimed benefit to a calculation, drawing, qualification, inspection or package-level test that applies to the order.<\/td>\n<td>Verification and evidence plan<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<div class=\"rvq-boundary\"><b>Decision boundary:<\/b> This guidance supports screening and RFQ preparation. Final suitability, compliance and supplied scope require the actual application data, governing jurisdiction, contract documents, approved supplier submittals and tag-linked records.<\/div>\n<\/div>\n<\/section>\n<p><!-- RVQ-INTENT-END --><!-- RVQ-TRUST-START --><\/p>\n<section class=\"rvq-section rvq-trust\">\n<div class=\"rvq-wrap\">\n<div class=\"rvq-kicker\">Content responsibility &amp; evidence<\/div>\n<h2>How this High-Temperature High-Pressure Electric Control Valve guide should be used<\/h2>\n<div class=\"rvq-grid\">\n<div><b>Publisher<\/b><span>Raymon Valve technical content team<\/span><\/div>\n<div><b>Purpose<\/b><span>Engineering screening, specification and RFQ preparation<\/span><\/div>\n<div><b>Content update<\/b><span>29 July 2026<\/span><\/div>\n<div><b>Verification level<\/b><span>Topic scope, search intent and evidence boundaries checked<\/span><\/div>\n<\/div>\n<p>This page does not claim that a named person, certificate, qualification, installed project or performance result applies to a future order. Product compliance is confirmed only when the accepted quotation, approved drawing, procedures and final manufacturing\/test records identify the supplied configuration.<\/p>\n<p>Technical requirements and standards can change. Verify the official source, contract edition, project precedence and purchaser options. See our <a href=\"\/technical-content-review-policy\/\">technical content review and evidence policy<\/a>, <a href=\"\/about-us\/\">company information<\/a>, <a href=\"\/valve-inspection\/\">inspection approach<\/a> or <a href=\"\/contact\/\">submit a correction or application question<\/a>.<\/p>\n<\/div>\n<\/section>\n<p><!-- RVQ-TRUST-END --><!-- RVQ-SCHEMA-START --><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"WebPage\",\"name\":\"High-Temperature High-Pressure Electric Control Valve\",\"url\":\"https:\/\/raymonvalve.com\/product\/high-temperature-and-high-pressure-electric-control-valve\/\",\"dateModified\":\"2026-07-29\",\"description\":\"Product selection guide for High-Temperature High-Pressure Electric Control Valve, with application boundaries, decision inputs and order-specific evidence requirements.\",\"publisher\":{\"@type\":\"Organization\",\"name\":\"Raymon Valve\",\"url\":\"https:\/\/raymonvalve.com\/\"},\"isPartOf\":{\"@type\":\"WebSite\",\"name\":\"Raymon Valve\",\"url\":\"https:\/\/raymonvalve.com\/\"},\"about\":{\"@type\":\"Thing\",\"name\":\"High-Temperature High-Pressure Electric Control Valve\"}}<\/script><!-- RVQ-SCHEMA-END --><\/p>\n<section id=\"faq\" class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">FAQ<\/div>\n<h2>High-Temperature High-Pressure Electric Control Valve questions<\/h2>\n<div class=\"rvp-faq\">\n<details>\n<summary>What information is required to select a High-Temperature High-Pressure Electric Control Valve?<\/summary>\n<p>Provide the medium and composition, all pressure and temperature cases, nominal size, flow or differential pressure where relevant, required function, end connections, materials, shutoff criterion, operation, standards, inspection and documentation. For this configuration, the review must specifically address electric actuator torque\/thrust, duty rating, power, controls and fail strategy.<\/p>\n<\/details>\n<details>\n<summary>Which standards apply to a High-Temperature High-Pressure Electric Control Valve?<\/summary>\n<p>The answer depends on the product construction, project jurisdiction and purchaser specification. A product standard may cover design scope while separate standards govern pressure-temperature rating, dimensions, ends, pressure testing, fire safety, emissions or materials. Electric fail action may require stored energy or an external system; loss-of-power behavior must be explicit.<\/p>\n<\/details>\n<details>\n<summary>How should High-Temperature High-Pressure Electric Control Valve pressure and leakage testing be specified?<\/summary>\n<p>Separate pressure-boundary, closure, functional and any special testing. Record the procedure, edition, duration, allowable leakage, intervention point and final evidence.<\/p>\n<\/details>\n<details>\n<summary>Can a High-Temperature High-Pressure Electric Control Valve be supplied with an actuator?<\/summary>\n<p>Where automation is feasible, size from the worst-case valve torque or thrust curve, project margin, fail action, travel time, minimum utility, duty, controls, mounting and package test.<\/p>\n<\/details>\n<details>\n<summary>When should a High-Temperature High-Pressure Electric Control Valve not be selected?<\/summary>\n<p>Do not select it when its qualified construction cannot satisfy the process, shutoff, materials, dynamics, maintenance or documentation requirements. Do not size a control valve from pipe diameter alone; incorrect Cv can cause poor resolution, noise, cavitation or premature trim damage. The alternative should be chosen only after comparing the complete service duty.<\/p>\n<\/details>\n<\/div>\n<\/div>\n<\/section>\n<\/div>\n<p><script type=\"application\/ld+json\">{\"@context\": \"https:\/\/schema.org\", \"@type\": \"FAQPage\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"What information is required to select a High-Temperature High-Pressure Electric Control Valve?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Provide the medium and composition, all pressure and temperature cases, nominal size, flow or differential pressure where relevant, required function, end connections, materials, shutoff criterion, operation, standards, inspection and documentation. For this configuration, the review must specifically address electric actuator torque\/thrust, duty rating, power, controls and fail strategy.\"}}, {\"@type\": \"Question\", \"name\": \"Which standards apply to a High-Temperature High-Pressure Electric Control Valve?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"The answer depends on the product construction, project jurisdiction and purchaser specification. A product standard may cover design scope while separate standards govern pressure-temperature rating, dimensions, ends, pressure testing, fire safety, emissions or materials. Electric fail action may require stored energy or an external system; loss-of-power behavior must be explicit.\"}}, {\"@type\": \"Question\", \"name\": \"How should High-Temperature High-Pressure Electric Control Valve pressure and leakage testing be specified?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Separate pressure-boundary, closure, functional and any special testing. Record the procedure, edition, duration, allowable leakage, intervention point and final evidence.\"}}, {\"@type\": \"Question\", \"name\": \"Can a High-Temperature High-Pressure Electric Control Valve be supplied with an actuator?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Where automation is feasible, size from the worst-case valve torque or thrust curve, project margin, fail action, travel time, minimum utility, duty, controls, mounting and package test.\"}}, {\"@type\": \"Question\", \"name\": \"When should a High-Temperature High-Pressure Electric Control Valve not be selected?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Do not select it when its qualified construction cannot satisfy the process, shutoff, materials, dynamics, maintenance or documentation requirements. Do not size a control valve from pipe diameter alone; incorrect Cv can cause poor resolution, noise, cavitation or premature trim damage. The alternative should be chosen only after comparing the complete service duty.\"}}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>V\u00e1lvula de Controle El\u00e9trica para Alta Temperatura e Alta Press\u00e3o para controle de processo modulante definido pelo projeto. A sele\u00e7\u00e3o aborda torque\/empuxo do atuador el\u00e9trico, classe de servi\u00e7o, pot\u00eancia, controles e estrat\u00e9gia de falha, materiais, opera\u00e7\u00e3o, testes e aceita\u00e7\u00e3o documentada antes da libera\u00e7\u00e3o da cota\u00e7\u00e3o.<\/p>","protected":false},"featured_media":3757,"comment_status":"closed","ping_status":"closed","template":"","meta":{"site-sidebar-layout":"default","site-content-layout":"default","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"default","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}}},"product_brand":[],"product_cat":[178,311,196,297],"product_tag":[],"class_list":["post-3751","product","type-product","status-publish","has-post-thumbnail","product_cat-control-valves","product_cat-high-temperature-and-high-pressure-valve","product_cat-power-station-valve","product_cat-power-station-high-differential-pressure-control-valve","desktop-align-left","tablet-align-left","mobile-align-left","ast-product-gallery-layout-horizontal-slider","ast-product-gallery-with-no-image","ast-product-tabs-layout-horizontal","ast-qv-on-image","first","instock","shipping-taxable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/raymonvalve.com\/pt\/wp-json\/wp\/v2\/product\/3751","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/raymonvalve.com\/pt\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/raymonvalve.com\/pt\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/raymonvalve.com\/pt\/wp-json\/wp\/v2\/comments?post=3751"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/raymonvalve.com\/pt\/wp-json\/wp\/v2\/media\/3757"}],"wp:attachment":[{"href":"https:\/\/raymonvalve.com\/pt\/wp-json\/wp\/v2\/media?parent=3751"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/raymonvalve.com\/pt\/wp-json\/wp\/v2\/product_brand?post=3751"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/raymonvalve.com\/pt\/wp-json\/wp\/v2\/product_cat?post=3751"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/raymonvalve.com\/pt\/wp-json\/wp\/v2\/product_tag?post=3751"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}