{"id":13575,"date":"2026-07-27T21:51:26","date_gmt":"2026-07-27T13:51:26","guid":{"rendered":"https:\/\/raymonvalve.com\/product\/on-off-valve-package\/"},"modified":"2026-07-27T22:35:18","modified_gmt":"2026-07-27T14:35:18","slug":"on-off-valve-package","status":"publish","type":"product","link":"https:\/\/raymonvalve.com\/ru\/product\/on-off-valve-package\/","title":{"rendered":"\u041a\u043e\u043c\u043f\u043b\u0435\u043a\u0442 \u0437\u0430\u043f\u043e\u0440\u043d\u043e\u0439 \u0430\u0440\u043c\u0430\u0442\u0443\u0440\u044b \u0441 \u044d\u043b\u0435\u043a\u0442\u0440\u043e\u043f\u0440\u0438\u0432\u043e\u0434\u043e\u043c"},"content":{"rendered":"<div class=\"rv-product-content rvp-content\">\n<section class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Engineering scope<\/div>\n<h2>From product name to an engineered On-Off Valve Package requirement<\/h2>\n<p class=\"rvp-lead\">A On-Off Valve Package is evaluated for integrated automated valve operation. The valve, actuator, mounting kit, controls and feedback devices are specified, assembled and function-tested as one tagged package.<\/p>\n<p>The product name narrows the route but does not complete the specification. Resolve discrete isolation, travel time, cycling and end-position confirmation together with the medium, operating cases, piping interface, maintenance and evidence.<\/p>\n<div class=\"rvp-grid\">\n<div class=\"rvp-card\"><strong>On-Off<\/strong><\/p>\n<p>Discrete isolation, travel time, cycling and end-position confirmation. Define normal and emergency cycle time, starts per hour, fail state, switches and interlocks.<\/p>\n<\/div>\n<div class=\"rvp-card\"><strong>Order-specific boundary<\/strong><\/p>\n<p>Website content is not tag-level certification. Suitability and supplied scope are established only by the accepted quotation, datasheet and drawing.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n<section class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Specification workflow<\/div>\n<h2>Convert process conditions into an auditable valve specification<\/h2>\n<p class=\"rvp-lead\">Use the matrix to close decisions often hidden behind the short description \u201cOn-Off Valve Package.\u201d<\/p>\n<div class=\"rvp-tablewrap\">\n<table class=\"rvp-table\">\n<thead>\n<tr>\n<th>Review area<\/th>\n<th>Engineering question<\/th>\n<th>Required record<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Package responsibility<\/td>\n<td>One approved scope must identify valve, actuator, controls, tubing, wiring and documentation boundaries.<\/td>\n<td>Make this requirement auditable through the order datasheet, design review and inspection plan.<\/td>\n<\/tr>\n<tr>\n<td>Safety action<\/td>\n<td>Fail state, trip logic, reset method and partial-stroke requirements must be defined.<\/td>\n<td>Capture the selection basis, approved deviation if any and the record used for acceptance.<\/td>\n<\/tr>\n<tr>\n<td>Interfaces<\/td>\n<td>Power, air, signal, hazardous-area and communication interfaces require project coordination.<\/td>\n<td>Resolve the open point before release and retain tag-specific evidence in the final dossier.<\/td>\n<\/tr>\n<tr>\n<td>Testing<\/td>\n<td>Functional, fail-action and interface checks must use approved acceptance criteria.<\/td>\n<td>Resolve the open point before release and retain tag-specific evidence in the final dossier.<\/td>\n<\/tr>\n<tr>\n<td>On-Off<\/td>\n<td>Define normal and emergency cycle time, starts per hour, fail state, switches and interlocks.<\/td>\n<td>Capture the selection basis, approved deviation if any and the record used for acceptance.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p class=\"rvp-note\">Check standards and acceptance criteria against the purchaser-approved edition before order release.<\/p>\n<\/div>\n<\/section>\n<section class=\"rvp-section rvp-dark\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Application boundaries<\/div>\n<h2>Service conditions that can change or reject the selection<\/h2>\n<p>Component nameplates alone do not prove package performance; assembly-level testing and records are required. The final decision must cover system interactions, end-of-life loads, degradation and how failure will be detected or contained.<\/p>\n<div class=\"rvp-checks\">\n<div class=\"rvp-check\">Process envelope, contaminants, phase behavior and every case that can govern the On-Off Valve Package<\/div>\n<div class=\"rvp-check\">Isolation\/control\/non-return function, frequency, directionality and measurable shutoff acceptance<\/div>\n<div class=\"rvp-check\">Piping class, mating ends, bore, installed length, orientation, loads and maintenance clearance<\/div>\n<div class=\"rvp-check\">Body, trim, seat, packing, bolting, lining or coating materials as applicable<\/div>\n<div class=\"rvp-check\">Worst-case torque\/thrust, cycle duty, travel time, fail behavior, minimum utility and control accessories<\/div>\n<div class=\"rvp-check\">Exact standards and editions, ITP points, material\/NDE\/pressure\/leakage tests and turnover index<\/div>\n<\/div>\n<\/div>\n<\/section>\n<section class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Evidence and quality<\/div>\n<h2>Define the manufacturing and test proof before release<\/h2>\n<p class=\"rvp-lead\">Generic examples may explain capability but cannot close an order requirement unless they apply to the delivered valve. Use the <a href=\"\/valve-standards\/\">valve standards guide<\/a> to separate product, rating, dimensional, end-connection and test scope.<\/p>\n<div class=\"rvp-grid\">\n<div class=\"rvp-card\">\n<h3>Design basis<\/h3>\n<p>Tag requirements, design review, materials list and approved exception register.<\/p>\n<\/div>\n<div class=\"rvp-card\">\n<h3>Material identity<\/h3>\n<p>Component certificates, heat or lot traceability, heat treatment, hardness and required PMI or NDE.<\/p>\n<\/div>\n<div class=\"rvp-card\">\n<h3>Inspection and tests<\/h3>\n<p>Approved ITP, procedures, calibrated instruments, results, witness records and NCR closeout.<\/p>\n<\/div>\n<\/div>\n<p>Fast closure may create surge and increased valve load.<\/p>\n<p>Qualification, testing and material suitability are conditional on the approved scope and supplied records for the actual configuration.<\/p>\n<\/div>\n<\/section>\n<section class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">RFQ checklist<\/div>\n<h2>Data to send for a technically complete quotation<\/h2>\n<p>A useful RFQ combines process data, piping class, construction and materials, operator\/actuator requirements, acceptance criteria and delivery documents.<\/p>\n<p>For a On-Off Valve Package, also highlight discrete isolation, travel time, cycling and end-position confirmation. List unresolved assumptions as deviations instead of embedding them silently in the offer.<\/p>\n<div class=\"rvp-cta\">\n<div>\n<h2>Ask for a configuration tied to the real duty<\/h2>\n<p>Share the datasheet, line class and evidence scope so open points and deviations can be resolved before order release.<\/p>\n<\/div>\n<div class=\"rvp-actions\"><a class=\"rvp-btn rvp-btn-primary\" href=\"\/contact\/\">Submit Your Datasheet<\/a><a class=\"rvp-btn rvp-btn-ghost\" href=\"\/actuated-valves\/\">Compare Valve Automation Package Options<\/a><\/div>\n<\/div>\n<\/div>\n<\/section>\n<section class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Related engineering route<\/div>\n<h2>Continue the selection review<\/h2>\n<div class=\"rvp-grid\"><a class=\"rvp-card\" href=\"\/actuated-valves\/\"><\/p>\n<h3>Product family<\/h3>\n<p>Compare the main constructions and selection boundaries in this valve family.<\/p>\n<p><\/a><a class=\"rvp-card\" href=\"\/valve-solutions\/\"><\/p>\n<h3>Project Valve Review<\/h3>\n<p>Resolve interacting pressure, temperature, corrosion, wear or project risks.<\/p>\n<p><\/a><a class=\"rvp-card\" href=\"\/valve-pressure-testing\/\"><\/p>\n<h3>Testing and inspection<\/h3>\n<p>Define pressure-test scope, acceptance, instruments, witness points and records.<\/p>\n<p><\/a><\/div>\n<\/div>\n<\/section>\n<section class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">FAQ<\/div>\n<h2>On-Off Valve Package questions<\/h2>\n<div class=\"rvp-faq\">\n<details>\n<summary>What information is required to select a On-Off Valve Package?<\/summary>\n<p>Provide the medium and composition, all pressure and temperature cases, nominal size, flow or differential pressure where relevant, required function, end connections, materials, shutoff criterion, operation, standards, inspection and documentation. For this configuration, the review must specifically address discrete isolation, travel time, cycling and end-position confirmation.<\/p>\n<\/details>\n<details>\n<summary>Which standards apply to a On-Off Valve Package?<\/summary>\n<p>The answer depends on the product construction, project jurisdiction and purchaser specification. A product standard may cover design scope while separate standards govern pressure-temperature rating, dimensions, ends, pressure testing, fire safety, emissions or materials. Fast closure may create surge and increased valve load.<\/p>\n<\/details>\n<details>\n<summary>How should On-Off Valve Package pressure and leakage testing be specified?<\/summary>\n<p>Separate pressure-boundary, closure, functional and any special testing. Record the procedure, edition, duration, allowable leakage, intervention point and final evidence.<\/p>\n<\/details>\n<details>\n<summary>Can a On-Off Valve Package be supplied with an actuator?<\/summary>\n<p>Where automation is feasible, size from the worst-case valve torque or thrust curve, project margin, fail action, travel time, minimum utility, duty, controls, mounting and package test.<\/p>\n<\/details>\n<details>\n<summary>When should a On-Off Valve Package not be selected?<\/summary>\n<p>Do not select it when its qualified construction cannot satisfy the process, shutoff, materials, dynamics, maintenance or documentation requirements. Component nameplates alone do not prove package performance; assembly-level testing and records are required. The alternative should be chosen only after comparing the complete service duty.<\/p>\n<\/details>\n<\/div>\n<\/div>\n<\/section>\n<\/div>\n<p><script type=\"application\/ld+json\">{\"@context\": \"https:\/\/schema.org\", \"@type\": \"FAQPage\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"What information is required to select a On-Off Valve Package?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Provide the medium and composition, all pressure and temperature cases, nominal size, flow or differential pressure where relevant, required function, end connections, materials, shutoff criterion, operation, standards, inspection and documentation. For this configuration, the review must specifically address discrete isolation, travel time, cycling and end-position confirmation.\"}}, {\"@type\": \"Question\", \"name\": \"Which standards apply to a On-Off Valve Package?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"The answer depends on the product construction, project jurisdiction and purchaser specification. A product standard may cover design scope while separate standards govern pressure-temperature rating, dimensions, ends, pressure testing, fire safety, emissions or materials. Fast closure may create surge and increased valve load.\"}}, {\"@type\": \"Question\", \"name\": \"How should On-Off Valve Package pressure and leakage testing be specified?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Separate pressure-boundary, closure, functional and any special testing. Record the procedure, edition, duration, allowable leakage, intervention point and final evidence.\"}}, {\"@type\": \"Question\", \"name\": \"Can a On-Off Valve Package be supplied with an actuator?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Where automation is feasible, size from the worst-case valve torque or thrust curve, project margin, fail action, travel time, minimum utility, duty, controls, mounting and package test.\"}}, {\"@type\": \"Question\", \"name\": \"When should a On-Off Valve Package not be selected?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Do not select it when its qualified construction cannot satisfy the process, shutoff, materials, dynamics, maintenance or documentation requirements. Component nameplates alone do not prove package performance; assembly-level testing and records are required. The alternative should be chosen only after comparing the complete service duty.\"}}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u041a\u043e\u043c\u043f\u043b\u0435\u043a\u0442 \u0437\u0430\u043f\u043e\u0440\u043d\u043e\u0439 \u0430\u0440\u043c\u0430\u0442\u0443\u0440\u044b \u0434\u043b\u044f \u043a\u043e\u043c\u043f\u043b\u0435\u043a\u0441\u043d\u043e\u0433\u043e \u0430\u0432\u0442\u043e\u043c\u0430\u0442\u0438\u0437\u0438\u0440\u043e\u0432\u0430\u043d\u043d\u043e\u0433\u043e \u0443\u043f\u0440\u0430\u0432\u043b\u0435\u043d\u0438\u044f \u043a\u043b\u0430\u043f\u0430\u043d\u043e\u043c, \u043e\u043f\u0440\u0435\u0434\u0435\u043b\u044f\u0435\u043c\u043e\u0433\u043e \u043f\u0440\u043e\u0435\u043a\u0442\u043e\u043c. \u0412\u044b\u0431\u043e\u0440 \u0443\u0447\u0438\u0442\u044b\u0432\u0430\u0435\u0442 \u0434\u0438\u0441\u043a\u0440\u0435\u0442\u043d\u0443\u044e \u0438\u0437\u043e\u043b\u044f\u0446\u0438\u044e, \u0432\u0440\u0435\u043c\u044f \u0445\u043e\u0434\u0430, \u0446\u0438\u043a\u043b\u0438\u0447\u043d\u043e\u0441\u0442\u044c \u0438 \u043f\u043e\u0434\u0442\u0432\u0435\u0440\u0436\u0434\u0435\u043d\u0438\u0435 \u043a\u043e\u043d\u0435\u0447\u043d\u043e\u0433\u043e \u043f\u043e\u043b\u043e\u0436\u0435\u043d\u0438\u044f, \u043c\u0430\u0442\u0435\u0440\u0438\u0430\u043b\u044b, \u0443\u043f\u0440\u0430\u0432\u043b\u0435\u043d\u0438\u0435, \u0438\u0441\u043f\u044b\u0442\u0430\u043d\u0438\u044f \u0438 \u0434\u043e\u043a\u0443\u043c\u0435\u043d\u0442\u0438\u0440\u043e\u0432\u0430\u043d\u043d\u043e\u0435 \u043f\u0440\u0438\u043d\u044f\u0442\u0438\u0435 \u043f\u0435\u0440\u0435\u0434 \u0432\u044b\u043f\u0443\u0441\u043a\u043e\u043c \u043a\u043e\u043c\u043c\u0435\u0440\u0447\u0435\u0441\u043a\u043e\u0433\u043e \u043f\u0440\u0435\u0434\u043b\u043e\u0436\u0435\u043d\u0438\u044f.<\/p>","protected":false},"featured_media":3757,"comment_status":"closed","ping_status":"closed","template":"","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}}},"product_brand":[],"product_cat":[],"product_tag":[],"class_list":["post-13575","product","type-product","status-publish","has-post-thumbnail","desktop-align-left","tablet-align-left","mobile-align-left","ast-product-gallery-layout-horizontal-slider","ast-product-gallery-with-no-image","ast-product-tabs-layout-horizontal","ast-qv-on-image","first","instock","shipping-taxable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/raymonvalve.com\/ru\/wp-json\/wp\/v2\/product\/13575","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/raymonvalve.com\/ru\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/raymonvalve.com\/ru\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/raymonvalve.com\/ru\/wp-json\/wp\/v2\/comments?post=13575"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/raymonvalve.com\/ru\/wp-json\/wp\/v2\/media\/3757"}],"wp:attachment":[{"href":"https:\/\/raymonvalve.com\/ru\/wp-json\/wp\/v2\/media?parent=13575"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/raymonvalve.com\/ru\/wp-json\/wp\/v2\/product_brand?post=13575"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/raymonvalve.com\/ru\/wp-json\/wp\/v2\/product_cat?post=13575"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/raymonvalve.com\/ru\/wp-json\/wp\/v2\/product_tag?post=13575"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}