{"id":4829,"date":"2022-09-03T10:36:40","date_gmt":"2022-09-03T02:36:40","guid":{"rendered":"https:\/\/limegreen-okapi-448594.hostingersite.com\/?post_type=product&#038;p=4829"},"modified":"2026-07-29T19:25:56","modified_gmt":"2026-07-29T11:25:56","slug":"zzyp-self-operated-pressure-control-valve","status":"publish","type":"product","link":"https:\/\/raymonvalve.com\/ru\/product\/zzyp-self-operated-pressure-control-valve\/","title":{"rendered":"\u0421\u0430\u043c\u043e\u0443\u043f\u0440\u0430\u0432\u043b\u044f\u0435\u043c\u044b\u0439 \u0440\u0435\u0433\u0443\u043b\u0438\u0440\u0443\u044e\u0449\u0438\u0439 \u043a\u043b\u0430\u043f\u0430\u043d ZZYP"},"content":{"rendered":"<div class=\"rv-product-content rvp-content\">\n<section id=\"overview\" class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Engineering scope<\/div>\n<h2>Define the application boundary for ZZYP Self-Operated Pressure Control Valve<\/h2>\n<p class=\"rvp-lead\">A ZZYP Self-Operated Pressure Control Valve is evaluated for modulating process control. A throttling element changes effective flow area in response to a control signal. Installed characteristic, Cv, pressure recovery, trim velocity and actuator resolution determine control quality.<\/p>\n<p>Before quoting this configuration, close process-powered regulation using sensing, spring range and valve authority and record all process, mechanical, operating and documentation assumptions.<\/p>\n<div class=\"rvp-grid\">\n<div class=\"rvp-card\">\n<h3>Self-Operated<\/h3>\n<p>Process-powered regulation using sensing, spring range and valve authority. Define controlled variable, setpoint\/range, sensing location, minimum\/maximum flow, available differential pressure and stability requirement.<\/p>\n<\/div>\n<div class=\"rvp-card\">\n<h3>Application envelope<\/h3>\n<p>Confirm every pressure, temperature, differential-pressure and cycling case for this ZZYP Self-Operated Pressure Control Valve.<\/p>\n<\/div>\n<div class=\"rvp-card\">\n<h3>Installed interface<\/h3>\n<p>Verify ends, bore, flow direction, orientation, operator envelope, loads and maintenance access.<\/p>\n<\/div>\n<div class=\"rvp-card\">\n<h3>Order-specific boundary<\/h3>\n<p>Treat this page as an engineering route, then verify the actual configuration, limits and evidence in controlled project documents.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n<section id=\"published-data\" class=\"rvp-section rvp-legacy-data\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Existing listing data<\/div>\n<h2>Published configuration data for ZZYP Self-Operated Pressure Control Valve\u2014confirmation required<\/h2>\n<p class=\"rvp-lead\">The values below are transcribed from the previous public product listing so useful model information is not lost during the quality rebuild. They are not a universal available range, certificate or order commitment. Confirm every value in the accepted quotation, tag datasheet and approved drawing.<\/p>\n<div class=\"rvp-tablewrap\">\n<table class=\"rvp-table\">\n<thead>\n<tr>\n<th>Parameter<\/th>\n<th>Previous listing<\/th>\n<th>Required order check<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><b>Product type<\/b><\/td>\n<td>Not stated in the previous public listing.<\/td>\n<td>Confirm the exact model, construction and supplied configuration.<\/td>\n<\/tr>\n<tr>\n<td><b>Nominal size \/ DN<\/b><\/td>\n<td>Not stated in the previous public listing.<\/td>\n<td>Confirm each ordered tag and available trim or bore combination.<\/td>\n<\/tr>\n<tr>\n<td><b>Pressure rating<\/b><\/td>\n<td>Not stated in the previous public listing.<\/td>\n<td>Confirm governing rating standard, class and temperature basis.<\/td>\n<\/tr>\n<tr>\n<td><b>Temperature<\/b><\/td>\n<td>Not stated in the previous public listing.<\/td>\n<td>Confirm design, operating, startup and upset metal temperatures.<\/td>\n<\/tr>\n<tr>\n<td><b>End connection<\/b><\/td>\n<td>Not stated in the previous public listing.<\/td>\n<td>Confirm standard, facing, schedule, bore and mating interface.<\/td>\n<\/tr>\n<tr>\n<td><b>Flow coefficient \/ characteristic<\/b><\/td>\n<td>Not stated in the previous public listing.<\/td>\n<td>Confirm calculated cases, trim, travel and installed behavior.<\/td>\n<\/tr>\n<tr>\n<td><b>Body \/ bonnet material<\/b><\/td>\n<td>Not stated in the previous public listing.<\/td>\n<td>Confirm component grade, product form, heat treatment and records.<\/td>\n<\/tr>\n<tr>\n<td><b>Trim \/ closure material<\/b><\/td>\n<td>Not stated in the previous public listing.<\/td>\n<td>Confirm every wetted component, hardness, coating and pairing.<\/td>\n<\/tr>\n<tr>\n<td><b>Seat \/ seal material<\/b><\/td>\n<td>Not stated in the previous public listing.<\/td>\n<td>Confirm compatibility, leakage criterion and pressure-temperature limit.<\/td>\n<\/tr>\n<tr>\n<td><b>Operation \/ actuator<\/b><\/td>\n<td>Not stated in the previous public listing.<\/td>\n<td>Confirm worst-case load, fail state, utilities, speed and accessories.<\/td>\n<\/tr>\n<tr>\n<td><b>Leakage basis<\/b><\/td>\n<td>Not stated in the previous public listing.<\/td>\n<td>Confirm standard, edition, test direction, medium and measurable acceptance.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p class=\"rvp-note\"><b>Evidence boundary:<\/b> where the previous listing was incomplete or awkwardly translated, this page does not guess a value. Raymon Valve should replace provisional web data with the controlled product datasheet when it is available.<\/p>\n<\/div>\n<\/section>\n<section id=\"specifications\" class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Specification workflow<\/div>\n<h2>Convert process conditions into an auditable valve specification<\/h2>\n<p class=\"rvp-lead\">Record the question, accepted answer and proof so the ZZYP Self-Operated Pressure Control Valve proposal can be audited across disciplines.<\/p>\n<div class=\"rvp-tablewrap\">\n<table class=\"rvp-table\">\n<thead>\n<tr>\n<th>Review area<\/th>\n<th>Engineering question<\/th>\n<th>Required record<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Sizing cases<\/td>\n<td>Minimum, normal, maximum, startup and upset cases require verified fluid properties and pressures.<\/td>\n<td>Name the controlling document, responsible reviewer and inspection or calculation record.<\/td>\n<\/tr>\n<tr>\n<td>Trim duty<\/td>\n<td>Cavitation, flashing, choked gas flow, noise, erosion and rangeability must be evaluated.<\/td>\n<td>Resolve the open point before release and retain tag-specific evidence in the final dossier.<\/td>\n<\/tr>\n<tr>\n<td>Actuator<\/td>\n<td>Required thrust or torque, fail action, stroking speed and utility supply must be coordinated.<\/td>\n<td>Capture the selection basis, approved deviation if any and the record used for acceptance.<\/td>\n<\/tr>\n<tr>\n<td>Accessories<\/td>\n<td>Positioner, solenoids, limit switches, air set and hazardous-area requirements form one package.<\/td>\n<td>State the measurable requirement and connect it to a drawing, procedure or test result.<\/td>\n<\/tr>\n<tr>\n<td>Self-Operated<\/td>\n<td>Define controlled variable, setpoint\/range, sensing location, minimum\/maximum flow, available differential pressure and stability requirement.<\/td>\n<td>State the measurable requirement and connect it to a drawing, procedure or test result.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p class=\"rvp-note\">A standard title alone is not acceptance. Map its scope, edition and required evidence to the valve tag.<\/p>\n<\/div>\n<\/section>\n<section id=\"applications\" class=\"rvp-section rvp-dark\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Application boundaries<\/div>\n<h2>Failure exposures behind the nominal configuration<\/h2>\n<p>Do not size a control valve from pipe diameter alone; incorrect Cv can cause poor resolution, noise, cavitation or premature trim damage. Installed behavior can be governed by flow dynamics, deposits, operating frequency, maintenance access and the response to abnormal conditions.<\/p>\n<div class=\"rvp-checks\">\n<div class=\"rvp-check\">Complete medium composition, pressure, temperature and flow cases for the ZZYP Self-Operated Pressure Control Valve<\/div>\n<div class=\"rvp-check\">Valve role, operating cycles, permitted leakage, safe state and consequence of failure<\/div>\n<div class=\"rvp-check\">Nominal interface plus the flange\/weld details, flow direction, face-to-face and operator envelope<\/div>\n<div class=\"rvp-check\">Corrosion and wear basis with exact body, trim, sealing, bolting, overlay, lining or coating materials<\/div>\n<div class=\"rvp-check\">Worst-case torque\/thrust, cycle duty, travel time, fail behavior, minimum utility and control accessories<\/div>\n<div class=\"rvp-check\">Exact standards and editions, ITP points, material\/NDE\/pressure\/leakage tests and turnover index<\/div>\n<\/div>\n<\/div>\n<\/section>\n<section id=\"quality\" class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Evidence and quality<\/div>\n<h2>Define the manufacturing and test proof before release<\/h2>\n<p class=\"rvp-lead\">A certificate or report is useful only when its scope traces to the actual tag, materials and configuration. Use the <a href=\"\/valve-standards\/\">valve standards guide<\/a> to separate product, rating, dimensional, end-connection and test scope.<\/p>\n<div class=\"rvp-grid\">\n<div class=\"rvp-card\">\n<h3>Design basis<\/h3>\n<p>Approved datasheet, drawing, bill of materials, rating basis and documented deviations.<\/p>\n<\/div>\n<div class=\"rvp-card\">\n<h3>Material identity<\/h3>\n<p>Tag-to-component material mapping with certificates, processing records and identity checks.<\/p>\n<\/div>\n<div class=\"rvp-card\">\n<h3>Inspection and tests<\/h3>\n<p>Hold\/witness records, material\/NDE\/pressure\/leakage\/functional results and nonconformance closure.<\/p>\n<\/div>\n<\/div>\n<p>Self-operated regulation requires sufficient process energy and correctly installed sensing; it is not independent of system dynamics.<\/p>\n<p>Do not infer certification or guaranteed performance from this page. Accept only the order-specific evidence required by the purchaser.<\/p>\n<\/div>\n<\/section>\n<section id=\"rfq\" class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">RFQ checklist<\/div>\n<h2>Build a comparable inquiry for this valve configuration<\/h2>\n<p>Send tag identity, quantity, fluid, all design and operating cases, line interface, function, flow data, materials, operation, testing, inspection and turnover scope.<\/p>\n<p>For a ZZYP Self-Operated Pressure Control Valve, also highlight process-powered regulation using sensing, spring range and valve authority. Identify missing inputs and provisional selections so they can be closed before purchase order release.<\/p>\n<div class=\"rvp-cta\">\n<div>\n<h2>Turn the datasheet into a clarified quotation basis<\/h2>\n<p>Share the datasheet, line class and evidence scope so open points and deviations can be resolved before order release.<\/p>\n<\/div>\n<div class=\"rvp-actions\"><a class=\"rvp-btn rvp-btn-primary\" href=\"\/contact\/\">Submit Your Datasheet<\/a><a class=\"rvp-btn rvp-btn-ghost\" href=\"\/control-valves\/\">Compare Control Valve Options<\/a><\/div>\n<\/div>\n<\/div>\n<\/section>\n<section class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">Related engineering route<\/div>\n<h2>Continue the selection review<\/h2>\n<div class=\"rvp-grid\"><a class=\"rvp-card\" href=\"\/control-valves\/\"><\/p>\n<h3>Product family<\/h3>\n<p>Compare the main constructions and selection boundaries in this valve family.<\/p>\n<p><\/a><a class=\"rvp-card\" href=\"\/valve-solutions\/\"><\/p>\n<h3>Project Valve Review<\/h3>\n<p>Resolve interacting pressure, temperature, corrosion, wear or project risks.<\/p>\n<p><\/a><a class=\"rvp-card\" href=\"\/valve-pressure-testing\/\"><\/p>\n<h3>Testing and inspection<\/h3>\n<p>Define pressure-test scope, acceptance, instruments, witness points and records.<\/p>\n<p><\/a><\/div>\n<\/div>\n<\/section>\n<p><!-- RVQ-CSS-START --><\/p>\n<style id=\"rvq-quality-css\">.rvq-section{padding:68px 0;font-family:Arial,Helvetica,sans-serif;color:#17233a;line-height:1.7}.rvq-wrap{width:min(1160px,calc(100% - 40px));margin:auto}.rvq-intent{background:#f4f7fb}.rvq-trust{background:#fff}.rvq-kicker{color:#07549a;font-size:12px;font-weight:800;letter-spacing:.13em;text-transform:uppercase}.rvq-section h2{font-size:clamp(28px,3.5vw,42px);line-height:1.2;margin:8px 0 16px;color:#0b1731}.rvq-lead{max-width:900px;color:#5c6779;font-size:17px}.rvq-tablewrap{overflow-x:auto;margin-top:28px;border:1px solid #dfe5ee;border-radius:12px;background:#fff}.rvq-table{width:100%;border-collapse:collapse;min-width:760px}.rvq-table th{background:#07549a;color:#fff;text-align:left;padding:15px}.rvq-table td{padding:15px;border-bottom:1px solid #dfe5ee;vertical-align:top}.rvq-table tr:last-child td{border-bottom:0}.rvq-source,.rvq-boundary{margin-top:22px;padding:20px;border-left:5px solid #f3cc18;background:#fff8d8;border-radius:8px}.rvq-grid{display:grid;grid-template-columns:repeat(4,1fr);gap:14px;margin:25px 0}.rvq-grid>div{border:1px solid #dfe5ee;border-radius:10px;padding:18px;background:#f8fafc}.rvq-grid b,.rvq-grid span{display:block}.rvq-grid b{color:#07549a;margin-bottom:5px}.rvq-grid span{font-size:14px;color:#5c6779}@media(max-width:800px){.rvq-grid{grid-template-columns:1fr 1fr}}@media(max-width:520px){.rvq-wrap{width:min(100% - 28px,1160px)}.rvq-section{padding:50px 0}.rvq-grid{grid-template-columns:1fr}}<\/style>\n<p><!-- RVQ-CSS-END --><!-- RVQ-INTENT-START --><\/p>\n<section class=\"rvq-section rvq-intent\">\n<div class=\"rvq-wrap\">\n<div class=\"rvq-kicker\">Task-specific answer<\/div>\n<h2>Convert ZZYP Self-Operated Pressure Control Valve from a broad request into an auditable engineering decision<\/h2>\n<p class=\"rvq-lead\">This section addresses the decision a visitor is likely trying to complete\u2014not merely the meaning of the page title. Use it to identify required inputs, compare the proposal and specify the record that will prove acceptance.<\/p>\n<div class=\"rvq-tablewrap\">\n<table class=\"rvq-table\">\n<thead>\n<tr>\n<th>Decision<\/th>\n<th>What to do<\/th>\n<th>Evidence to retain<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><b>Problem statement<\/b><\/td>\n<td>For ZZYP Self-Operated Pressure Control Valve, define the required system outcome, failure consequence and measurable acceptance before choosing hardware.<\/td>\n<td>Functional requirement<\/td>\n<\/tr>\n<tr>\n<td><b>Feasible routes<\/b><\/td>\n<td>Compare at least the practical construction, material, sealing and actuation alternatives, including reasons for rejection.<\/td>\n<td>Option and trade-off matrix<\/td>\n<\/tr>\n<tr>\n<td><b>Boundary conditions<\/b><\/td>\n<td>Check every normal, transient, startup, shutdown, maintenance and utility-loss case that can change the solution.<\/td>\n<td>Approved application data<\/td>\n<\/tr>\n<tr>\n<td><b>Validation<\/b><\/td>\n<td>Connect each claimed benefit to a calculation, drawing, qualification, inspection or package-level test that applies to the order.<\/td>\n<td>Verification and evidence plan<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<div class=\"rvq-boundary\"><b>Decision boundary:<\/b> This guidance supports screening and RFQ preparation. Final suitability, compliance and supplied scope require the actual application data, governing jurisdiction, contract documents, approved supplier submittals and tag-linked records.<\/div>\n<\/div>\n<\/section>\n<p><!-- RVQ-INTENT-END --><!-- RVQ-TRUST-START --><\/p>\n<section class=\"rvq-section rvq-trust\">\n<div class=\"rvq-wrap\">\n<div class=\"rvq-kicker\">Content responsibility &amp; evidence<\/div>\n<h2>How this ZZYP Self-Operated Pressure Control Valve guide should be used<\/h2>\n<div class=\"rvq-grid\">\n<div><b>Publisher<\/b><span>Raymon Valve technical content team<\/span><\/div>\n<div><b>Purpose<\/b><span>Engineering screening, specification and RFQ preparation<\/span><\/div>\n<div><b>Content update<\/b><span>29 July 2026<\/span><\/div>\n<div><b>Verification level<\/b><span>Topic scope, search intent and evidence boundaries checked<\/span><\/div>\n<\/div>\n<p>This page does not claim that a named person, certificate, qualification, installed project or performance result applies to a future order. Product compliance is confirmed only when the accepted quotation, approved drawing, procedures and final manufacturing\/test records identify the supplied configuration.<\/p>\n<p>Technical requirements and standards can change. Verify the official source, contract edition, project precedence and purchaser options. See our <a href=\"\/technical-content-review-policy\/\">technical content review and evidence policy<\/a>, <a href=\"\/about-us\/\">company information<\/a>, <a href=\"\/valve-inspection\/\">inspection approach<\/a> or <a href=\"\/contact\/\">submit a correction or application question<\/a>.<\/p>\n<\/div>\n<\/section>\n<p><!-- RVQ-TRUST-END --><!-- RVQ-SCHEMA-START --><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"WebPage\",\"name\":\"ZZYP Self-Operated Pressure Control Valve\",\"url\":\"https:\/\/raymonvalve.com\/product\/zzyp-self-operated-pressure-control-valve\/\",\"dateModified\":\"2026-07-29\",\"description\":\"Product selection guide for ZZYP Self-Operated Pressure Control Valve, with application boundaries, decision inputs and order-specific evidence requirements.\",\"publisher\":{\"@type\":\"Organization\",\"name\":\"Raymon Valve\",\"url\":\"https:\/\/raymonvalve.com\/\"},\"isPartOf\":{\"@type\":\"WebSite\",\"name\":\"Raymon Valve\",\"url\":\"https:\/\/raymonvalve.com\/\"},\"about\":{\"@type\":\"Thing\",\"name\":\"ZZYP Self-Operated Pressure Control Valve\"}}<\/script><!-- RVQ-SCHEMA-END --><\/p>\n<section id=\"faq\" class=\"rvp-section\">\n<div class=\"rvp-wrap\">\n<div class=\"rvp-kicker\">FAQ<\/div>\n<h2>ZZYP Self-Operated Pressure Control Valve questions<\/h2>\n<div class=\"rvp-faq\">\n<details>\n<summary>What information is required to select a ZZYP Self-Operated Pressure Control Valve?<\/summary>\n<p>Provide the medium and composition, all pressure and temperature cases, nominal size, flow or differential pressure where relevant, required function, end connections, materials, shutoff criterion, operation, standards, inspection and documentation. For this configuration, the review must specifically address process-powered regulation using sensing, spring range and valve authority.<\/p>\n<\/details>\n<details>\n<summary>Which standards apply to a ZZYP Self-Operated Pressure Control Valve?<\/summary>\n<p>The answer depends on the product construction, project jurisdiction and purchaser specification. A product standard may cover design scope while separate standards govern pressure-temperature rating, dimensions, ends, pressure testing, fire safety, emissions or materials. Self-operated regulation requires sufficient process energy and correctly installed sensing; it is not independent of system dynamics.<\/p>\n<\/details>\n<details>\n<summary>How should ZZYP Self-Operated Pressure Control Valve pressure and leakage testing be specified?<\/summary>\n<p>State the governing standard and approved edition, shell and closure basis, medium, pressure, duration, leakage acceptance, directionality, instruments, witness points and report format.<\/p>\n<\/details>\n<details>\n<summary>Can a ZZYP Self-Operated Pressure Control Valve be supplied with an actuator?<\/summary>\n<p>Where automation is feasible, size from the worst-case valve torque or thrust curve, project margin, fail action, travel time, minimum utility, duty, controls, mounting and package test.<\/p>\n<\/details>\n<details>\n<summary>When should a ZZYP Self-Operated Pressure Control Valve not be selected?<\/summary>\n<p>Do not select it when its qualified construction cannot satisfy the process, shutoff, materials, dynamics, maintenance or documentation requirements. Do not size a control valve from pipe diameter alone; incorrect Cv can cause poor resolution, noise, cavitation or premature trim damage. The alternative should be chosen only after comparing the complete service duty.<\/p>\n<\/details>\n<\/div>\n<\/div>\n<\/section>\n<\/div>\n<p><script type=\"application\/ld+json\">{\"@context\": \"https:\/\/schema.org\", \"@type\": \"FAQPage\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"What information is required to select a ZZYP Self-Operated Pressure Control Valve?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Provide the medium and composition, all pressure and temperature cases, nominal size, flow or differential pressure where relevant, required function, end connections, materials, shutoff criterion, operation, standards, inspection and documentation. For this configuration, the review must specifically address process-powered regulation using sensing, spring range and valve authority.\"}}, {\"@type\": \"Question\", \"name\": \"Which standards apply to a ZZYP Self-Operated Pressure Control Valve?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"The answer depends on the product construction, project jurisdiction and purchaser specification. A product standard may cover design scope while separate standards govern pressure-temperature rating, dimensions, ends, pressure testing, fire safety, emissions or materials. Self-operated regulation requires sufficient process energy and correctly installed sensing; it is not independent of system dynamics.\"}}, {\"@type\": \"Question\", \"name\": \"How should ZZYP Self-Operated Pressure Control Valve pressure and leakage testing be specified?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"State the governing standard and approved edition, shell and closure basis, medium, pressure, duration, leakage acceptance, directionality, instruments, witness points and report format.\"}}, {\"@type\": \"Question\", \"name\": \"Can a ZZYP Self-Operated Pressure Control Valve be supplied with an actuator?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Where automation is feasible, size from the worst-case valve torque or thrust curve, project margin, fail action, travel time, minimum utility, duty, controls, mounting and package test.\"}}, {\"@type\": \"Question\", \"name\": \"When should a ZZYP Self-Operated Pressure Control Valve not be selected?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Do not select it when its qualified construction cannot satisfy the process, shutoff, materials, dynamics, maintenance or documentation requirements. Do not size a control valve from pipe diameter alone; incorrect Cv can cause poor resolution, noise, cavitation or premature trim damage. The alternative should be chosen only after comparing the complete service duty.\"}}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>ZZYP \u2014 \u0440\u0435\u0433\u0443\u043b\u0438\u0440\u0443\u044e\u0449\u0438\u0439 \u043a\u043b\u0430\u043f\u0430\u043d \u0441 \u0441\u0430\u043c\u043e\u0434\u0435\u0439\u0441\u0442\u0432\u0443\u044e\u0449\u0438\u043c \u043f\u0440\u0438\u0432\u043e\u0434\u043e\u043c \u0434\u043b\u044f \u043c\u043e\u0434\u0443\u043b\u0438\u0440\u0443\u044e\u0449\u0435\u0433\u043e \u0443\u043f\u0440\u0430\u0432\u043b\u0435\u043d\u0438\u044f \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0438\u0447\u0435\u0441\u043a\u0438\u043c \u043f\u0440\u043e\u0446\u0435\u0441\u0441\u043e\u043c, \u043e\u043f\u0440\u0435\u0434\u0435\u043b\u044f\u0435\u043c\u043e\u0433\u043e \u043f\u0440\u043e\u0435\u043a\u0442\u043e\u043c. \u0412\u044b\u0431\u043e\u0440 \u0443\u0447\u0438\u0442\u044b\u0432\u0430\u0435\u0442 \u0440\u0435\u0433\u0443\u043b\u0438\u0440\u043e\u0432\u0430\u043d\u0438\u0435 \u0441 \u0438\u0441\u043f\u043e\u043b\u044c\u0437\u043e\u0432\u0430\u043d\u0438\u0435\u043c \u044d\u043d\u0435\u0440\u0433\u0438\u0438 \u043f\u0440\u043e\u0446\u0435\u0441\u0441\u0430, \u0434\u0438\u0430\u043f\u0430\u0437\u043e\u043d \u043f\u0440\u0443\u0436\u0438\u043d\u044b \u0438 \u043f\u0440\u043e\u043f\u0443\u0441\u043a\u043d\u0443\u044e \u0441\u043f\u043e\u0441\u043e\u0431\u043d\u043e\u0441\u0442\u044c \u043a\u043b\u0430\u043f\u0430\u043d\u0430, \u043c\u0430\u0442\u0435\u0440\u0438\u0430\u043b\u044b, \u043f\u0440\u0438\u043d\u0446\u0438\u043f \u0440\u0430\u0431\u043e\u0442\u044b, \u0438\u0441\u043f\u044b\u0442\u0430\u043d\u0438\u044f \u0438 \u0434\u043e\u043a\u0443\u043c\u0435\u043d\u0442\u0430\u043b\u044c\u043d\u043e\u0435 \u043f\u043e\u0434\u0442\u0432\u0435\u0440\u0436\u0434\u0435\u043d\u0438\u0435 \u043f\u0435\u0440\u0435\u0434 \u0432\u044b\u043f\u0443\u0441\u043a\u043e\u043c \u043a\u043e\u043c\u043c\u0435\u0440\u0447\u0435\u0441\u043a\u043e\u0433\u043e \u043f\u0440\u0435\u0434\u043b\u043e\u0436\u0435\u043d\u0438\u044f.<\/p>","protected":false},"featured_media":5548,"comment_status":"closed","ping_status":"closed","template":"","meta":{"site-sidebar-layout":"default","site-content-layout":"default","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"default","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}}},"product_brand":[],"product_cat":[178],"product_tag":[319],"class_list":["post-4829","product","type-product","status-publish","has-post-thumbnail","product_cat-control-valves","product_tag-petrochemical","desktop-align-left","tablet-align-left","mobile-align-left","ast-product-gallery-layout-horizontal-slider","ast-product-gallery-with-no-image","ast-product-tabs-layout-horizontal","ast-qv-on-image","first","instock","shipping-taxable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/raymonvalve.com\/ru\/wp-json\/wp\/v2\/product\/4829","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/raymonvalve.com\/ru\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/raymonvalve.com\/ru\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/raymonvalve.com\/ru\/wp-json\/wp\/v2\/comments?post=4829"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/raymonvalve.com\/ru\/wp-json\/wp\/v2\/media\/5548"}],"wp:attachment":[{"href":"https:\/\/raymonvalve.com\/ru\/wp-json\/wp\/v2\/media?parent=4829"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/raymonvalve.com\/ru\/wp-json\/wp\/v2\/product_brand?post=4829"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/raymonvalve.com\/ru\/wp-json\/wp\/v2\/product_cat?post=4829"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/raymonvalve.com\/ru\/wp-json\/wp\/v2\/product_tag?post=4829"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}